Works within Carlton’s Prince Alfred Hotel are quickly progressing with over 70% of the structural steel installed and the final concrete suspended slab poured. Check out this nifty time-lapse taken during the pour below. Switch will be working right through Christmas break to ensure the Prince Alfred Hotel is the pinnacle of Melbourne university’s 2018 opening celebrations.