VIVA Vermont VIC - Update #2
- SwitchCo
- Jun 1, 2018
- 1 min read
The Viva Vermont Tank Replacement Project (TRP) is progressing well. The tank farm was backfilled using this Telescopic Belt Conveyor (also known as a Telebelt) as shown in the video here. It was a very fast, efficient and safe way to lay all the gravel required. Since then, fuel pipework has been installed and backfilled with the under-canopy concrete slab poured.
We are certainly looking forward to the canopy installation within the next few weeks!