Jasbe Seven Hills NSW - Update #3

  • Writer: SwitchCo
    SwitchCo
  • Jul 23, 2018
  • 1 min read


Jasbe Petroleum’s Seven Hills continues at a pace, with Lanskey Constructions and their subcontractors making excellent progress. The nearmap.com.au aerial shot has been updated online, showing a wonderful stage of construction – the fuel tanks and fill pipework are all installed and still exposed; the car canopy footings are nearly ready to be poured; and the shop’s in-slab services between ground floor and first floor can be seen in amongst the reo in preparation for the concrete pour.